Resistance and flexbility for any project
The building system with plasticized steel panels reaches out different landscape constraints.
The interlocking panelling is anchored in turn to the reinforced concrete raft through buttresses, outlines a rigid and safe structure.
First Step
The first step starts with the excavation as well as with the masonry pools. Then, it proceeds with the bottom sockets predisposition and with the underfloor placing vents.
Second Step
Later, the process moves to the installation of the interlocking panels and of the buttresses by means of bolts and screws. Everything is anchored to the raft and then aligned and leveled.
Third Step
In the last step the different vent and the headlight on the panelling are assembled. Eventually, it moves on to the drafting of the drop.